Gear - Nose Gear Installed

01-02SEP2024
     
I got a better drill bit and finished drilling the nose fork.  I also drilled and tapped the bottom bearing, and made the templates to drill the back side holes through the firewall stiffener.  I also put the pucks on to get a rough idea of where they'll end up. 
  
Tom helped me get the wheel and tire together and installed on the nose gear.
  
I then started to work on the gear support rubber.  I finished the bottom piece for both sides and will work on the top piece next weekend.
  
Nose Gear


Nose Gear


Bottom Gear Support Rubber




Build Time:  6 hours