Gear - Main Gear Installed

07-08SEP2024
     
This weekend, I continued with the main gear.  I notched out the second bottom gear support rubber and drilled and trimmed the main gear support.
  
Tom used the grinder to grind out the clearance for the brakes.  When I was marking the area to remove, I didn't realize that the gear got rotated when I was sanding out the bolt notches and  I marked the wrong side.  Oops - the front side of my gear will also have notches now.
  
We got the main gear and wheels loosely installed.  I was missing 4 bolts and 8 nuts from the wheel kit so I couldn't fully put the wheels on, but hopefully next weekend.
  
Main Gear Installed


Main Gear Installed




Build Time:  6 hours 15 minutes