Forward Fuselage - Strut Attachments

25FEB2024
     
Now that my strut attachments fit, I was able to move forward with getting those drilled.
  
I started by making the l-angles for the gear channel and back drilling those.  Then I match drilled the strut attachments to the cabin sides.
  
I was going to also work on the gear channel doublers, but I don't have a 3/16 bit for my angle drill.


Right Side Strut Attachment


Left Side Strut Attachment


Right Side Gear Channel L-angle


Left Side Gear Channel L-angle




Build Time:  3 hours 30 minutes