17JUN2023
Started the day off by spending a couple of hours deburring, sanding, and priming the top skin. Once the primer was dry, I riveted on the l-angles and then Tom helped me lift the skin onto the sides. Two of the supplied diagonal l-angles were too long and were interfering with the longerons, so I had to drill those rivets out and trim the l-angles.
I also got a few other supports and brackets clecoed in.